The Santipur Local – Part 2
McLeod's Light Railways began operations on the Ahmedpur–Katwa Railway connecting Ahmadpur (now Birbhum district) and Katwa (now East Burdwan district) on 29 September 1917 in two phases. The railway was built in 2 ft 6 in (762 mm) gauge and the total length of the